A shared record for architects and their clients: every drawing, decision and change, signed off from a link, so the invoice never arrives as a surprise.

Role

Product Designer and UX Researcher (solo)

Platform

Web, responsive: studio on desktop, client on phone

Timeline

Self-initiated, Oct 2026, 3 weeks, solo

Status

Live prototype

Tools

AI coding tools wrote most of the code from my specs; I ran the research and wrote the stage model, flows and every client-facing sentence.

<aside> 🔎

At a glance: A 6-month architectural internship, two research rounds with 6 architects and 4 homeowners in Pune, Bengaluru and Mumbai, and an audit of six approaches. In round 2 on the working prototype, all 6 architects found what was open and all 4 clients approved from a link and read the fee before saying yes. Ten people across two rounds, so treat this as direction, not proof.

</aside>

The client's link and the studio's billing. A phone approval with the fee above the button, and invoices that cite the approvals behind them. Real screens from the live prototype.

The client's link and the studio's billing. A phone approval with the fee above the button, and invoices that cite the approvals behind them. Real screens from the live prototype.


01 · Problem

Before I designed software, I drew buildings. During a 6-month architectural internship, I owned plans, sections, renders and client presentations on an institutional project, from concept to the execution set, coordinating with structural and MEP consultants. The hard part was keeping track of what the client had agreed to.

Approvals and changes arrived wherever was nearest: chat apps, an email reply, a remark in a meeting. Every revision added another "final" to the folder, and a change not written down with its cost came back as rework or an invoice dispute. Architecture has a precise language for stages, sheets and revisions. The agreements around them had none.

Architects and project leads

Chasing a yes, defending scope, rebuilding the trail from chat.

Homeowners and clients

Deciding on a phone, unsure what a yes commits them to.

Consultants

Structural and MEP engineers who need the agreed sheet.

How might we give an architect and a client one shared record of what was agreed, sheet by sheet and fee by fee, without asking the client to learn new software?

02 · Discovery

Discovery had three sources: six months inside the problem during my architectural internship; two rounds of research with 6 architects and 4 homeowners across Pune, Bengaluru and Mumbai (architects in both rounds, homeowners in round 2); and a competitive audit from public product pages and help docs comparing six ways a client's yes is tracked today. My starting assumption: this was a storage problem. Put every drawing in one place and approvals would follow.

What I found

What changed my direction

The real problem was agreement. "Approve from a link" was already solved for builders. The gap was earlier and specific to architects: the design stages, where a yes is given on a sheet or in a chat, and its cost should be visible before anyone says it.

Competitive audit from public product pages and help docs (October 2026). The gap: nothing tied per-sheet sign-off, chat decisions and fees together across the design stages.

Competitive audit from public product pages and help docs (October 2026). The gap: nothing tied per-sheet sign-off, chat decisions and fees together across the design stages.

One change, six handoffs: the pattern I lived at the studio, reconstructed with a client project in Ledger. Each step is where the record could have started, and didn't.

One change, six handoffs: the pattern I lived at the studio, reconstructed with a client project in Ledger. Each step is where the record could have started, and didn't.

03 · Design process

I designed Ledger the way I'd set up a drawing set: stages first, then sheets, then the decisions that hang off them. Two surfaces share one record: the studio's desktop view and the client's link on a phone.

Reconstructed wireframe. I was testing one question: what must a client see before a yes means something? The answer put the fee directly above the only primary action.

Reconstructed wireframe. I was testing one question: what must a client see before a yes means something? The answer put the fee directly above the only primary action.

1. Organised by the stages of practice

Options: a task board, as generic project tools use, or a timeline built on the five stages of practice: Concept, Design development, Working drawings, Site supervision, Handover. Chose: the stages, because architects and clients already contract and invoice in them, so the structure needs no explaining. Each stage carries one sentence about the client's job ("Sign each sheet before it goes to site"), and each sheet sits in the stage it was issued in, like a drawing register. Cost: flexibility: real projects overlap stages. The Iyer renovation in the prototype still fits, but custom stage lists are deferred.